Norham Community Renewable Development Planning documents: posted 24/11/2025
Link: Planning Documents – Norham Community Energy Project
– / –
Renewable community energy project presentation Norham Village Hall, Weds 25th June 2025
Visualisations of proposed wind turbine
- Posted 13th August 2024
- Site layout plan
- Zone of Theoretical Visibility 67m-Tip
- VP 01-Grindon
- VP 02-A698-B6471-Junction
- VP 03-Ladykirk-Norham-Bridge
- VP 04-Halidon-Hill
- VP 05-Norham-Castle
Frequently Asked Questions published 1st July 2024 and circulated with Norham Newsround
Norham Community Renewable Energy Project – The story so far 17th May 2024
Community drop-in session slides
Norham Village Hall 03 April 2024
- Board-1-Welcome-board
- Board-2-proposed-development
- Board-3-Norham Development Trust
- Board-4-Ecology-Hydrology-and-Cultural
- Board-5-Landscape and Visual Impact Assessment
- Board-6-Noise-and-Shadow
- Board-7-NDT-Our-Story-so-far
Organisation Links
- What is NDT A-brief-history 19-05-24
- Norham Development Trust page on Norham Life
- Norham Development Trust – Companies House
- NDT-Incorporation-Document-06-Feb-2019
- Greencat Renewables Home Page
- Greencat Renewables Communities Page
Planning Scoping Study
Northumberland Planning Portal 27/06/23
- Scope Norham Turbine
- SCOPE-Norham-PC
- SCOPE-NCC-Right of Way
- SCOPE-NCC-Public-Protection
- SCOPE-NCC-Highways DM
- SCOPE-NCC-Ecology
- SCOPE-N Air Traffic S
- SCOPE-LLFA flood management
- SCOPE-Historic-England
- SCOPE-BUILT_HERITAGE
- SCOPE-ARC NCC Scoping Opinion
- SCOPE-Northumbrian Water
Planning Scoping Study
Northumberland Planning Portal registered 15/05/23
- Fig-2.1-Site-location-plan
- Fig-2.2a-Site-Constraints-Plan-for-Wind-Turbine
- Fig-2.2b-Site-Constraints-Plan-for-Solar
- Fig-2.3-Site-Layout
- Fig-5.1-20km-Study-Area
- Fig-5.2-Landscape-Character-Types
- Fig-5.3-Cumulative-Basemap
- Fig-5.4-ZTV-to-67m-T-ip
- Fig-5.5-ZTV-to-40m-Hub
- Fig-5.6-Cumulative-Wind-Solar-ZTV
- Fig-5.7-Landscape-designations
- Fig-6.1-Direct-Impacts-Cultural-v1.0.
- Fig-6.2-Indirect-impacts-to-Cultural-Heritage
- Fig-9.1-Hydrological-Constraints-Map
Initial Feasibility Study
GC Feasibility Study posted Facebook 16-02-2022
- GC Feasibility Study-non-technical-summary
- GC Full Feasibility Study Aug 21 (57 pages) available by application to norhamdeveloptrust@gmail.com